That looks like a big job and an exciting one! I bet your horses will enjoy that space!
They freaking better!
Got all of the step in posts in, some will move to make a more narrow or wider track, once the tape is hung up and I can walk it to get a feel for where I don't want them to laze around (neighbor area) or where I need them to spread out & cause less ground damage (driveway mud & around house mud areas).
Got about half of the tape up. Two strands of new-ish 1" tape. Hoping just two will work, if not, I'll add a middle bare wire strand. But with all of that green, it should work until they gobble it all up.
Posts on corners, dips and hills will be replaced with tposts. Will also decide where to put gates and those areas will have tposts and cut off switches added.
Still need to stretch mesh fencing and add insulators to them, then bare wire to keep ponies contained and out of sheep pastures!
Sheep for scale, lol, mini sheep, max out at 2ft, trough is 2ft. Need to add gravel to level it out. Back side will have built up gravel to allow sheep to reach in. Front will have gravel to keep area dry and not a mudpit.
This area needs to be wide.
And this area also needs to be wide.