My husband and I are former high school teachers. For the last few years while we were teaching we started doing soil tests (perc tests) for new and replacement septic systems. We had to get licensed by the state to do this. It went so well that 13 years ago my husband decided to take early retirement from teaching, in order to extend our soil testing season into the fall and spring months. I quit my teaching job when he did. We went on to get licensed in other areas, such as Wetland Mitigation, Private On Site Waste Treatment Inspection, and Septic System Design.
We love being our own bosses. I go to all the sites with him. My job on site is to shoot all the elevations we need, and I dig the holes with the backhoe. We try to only work three days a week in the summer, but often end up working four, but we are always home no later than 3 PM and we never schedule jobs on Fridays, so we always have a three day weekend. We work so well together that we can go to a site, get the holes dug, the soils analyzed, the elevations shot, the houses and outbuildings all drawn up and be out of there in 90 minutes.